At a glance
  • Define the behaviour that must change and the conditions that make it possible.
  • Involve the people who will operate the change before the handover.
  • Measure meaningful use alongside outcomes, friction and unresolved work.

Describe the new behaviour precisely

Transformation plans often describe a platform, a process or a future state. The people affected need to understand the action expected of them. A salesperson may need to record a customer commitment before handing work to delivery. A manager may need to use a shared capacity view before accepting another project. Specify those behaviours in the context of a real working day.

Then ask what would make the behaviour difficult. The required information may arrive too late, the interface may create duplicate entry or the existing incentive may reward a conflicting action. Resistance is not always a communications problem. It can reveal a genuine gap between the design and the conditions under which people are expected to use it.

Bring operating knowledge into the design

People who perform the work can identify exceptions and dependencies that are easy to overlook in a project plan. Involve a representative group early enough to change the design. Ask them to walk through difficult cases as well as routine ones. Their role should include examining whether the proposed process preserves what matters about the current service.

Participation does not mean that every preference determines the final answer. Make the constraints and decision rights clear. When an important concern cannot be addressed immediately, record the consequence and the intended response. People are better placed to engage with a decision when they can see that their information was considered and understand the tradeoff that was made.

Give the transition its own operating plan

Moving from one way of working to another creates temporary obligations. Data may need to be checked, open cases may span both systems and customers may receive different messages during the change. Decide how these situations will be handled before switching the main process. Define when the old route remains available and what conditions allow it to be retired.

A transition plan also needs a route for help. Explain where a person should report a problem, who will respond and how urgent issues are distinguished from improvement requests. A support channel without an owner can make a new process feel unreliable even when the underlying technology works. Early operating discipline is part of the adoption experience.

Equip managers to reinforce the change

Front-line managers translate a programme into everyday expectations. They need more than an announcement and a training deck. They need to understand which behaviours matter, what good use looks like and how to handle a conflict with existing targets. Give them a practical way to see where the process is helping and where the team is compensating for a design weakness.

Avoid making managers responsible for adoption while leaving contradictory incentives untouched. If speed is rewarded but the new process requires a quality check, explain how the tradeoff should be resolved. If a team is expected to clean historical data, allocate capacity for that work. Adoption is more credible when the organisation provides the conditions required for the requested behaviour.

Test the day after launch

Before approving release, ask a future user to complete a representative piece of work without the project team guiding each step. Include an incomplete input, a correction and a situation requiring help. Observe where they hesitate and whether the available instructions support a useful next action. This is different from demonstrating the ideal process to an audience that already knows how it should work.

Use the findings to decide what must be fixed before release and what can be supported during a controlled introduction. Record the support responsibility and the review date. A launch decision should recognise the actual readiness of the people and process, rather than treating completion of the technical build as sufficient evidence that the organisation can operate the change.

Learn from use after launch

Usage counts can reveal whether people are opening a tool, but they do not establish that the work has improved. Combine activity with evidence about completion, errors, handoffs and the experience of the people involved. Look for workarounds. Some indicate a training need; others show that a necessary case was omitted from the design.

Set a review rhythm that turns these observations into decisions. Resolve problems that prevent the intended work, distinguish them from optional refinements and communicate what changed. The delivery team should leave behind an owner, a manageable improvement backlog and a way to evaluate future changes. That continuity is what allows a launch to become an operating capability rather than a temporary project achievement.

What will make the new way easier to sustain when the implementation team is no longer in the room?
An original practice perspective from Kessler & Sterling. This article sets out a method or point of view; it does not report commissioned research or client results.